Process Design
Design basis · BFD / PFD development · mass and energy balance · process risk

Process engineering · EPC · Scale-up
Process design and integrated equipment delivery for battery materials and advanced powder systems—from laboratory validation to commercial production.
Engineering scope
Design basis · BFD / PFD development · mass and energy balance · process risk
Equipment list · technical specification · package selection · vendor alignment
Piping · controls · utilities · material flow · layout · plant interfaces
Project planning · supplier coordination · FAT · logistics · site and commissioning support
Engineering workflow
Each stage produces a specific technical basis for the next investment or procurement decision.
Feed, product, capacity, utilities and operating constraints
Unit operations, mass balance, recycle loops and critical controls
Trials, samples, data plan, operating window and scale-up criteria
Sizing basis, technical specification, vendor scope and interfaces
Layout, piping, utilities, controls, FAT and site delivery
Scale-up path
Use the scale that matches the technical question—not a generic equipment size.

Bench and modular systems for fast experiments, sample production and process screening.

Integrated pilot lines for operating-window development, material balance and product qualification.

Coordinated equipment, controls, utilities and delivery packages for industrial operation.
Application platforms
Precursor, cathode, anode, electrolyte-related and recycling process systems
Food, pharmaceutical, semiconductor and specialty-material handling, blending and packaging
Reaction, precipitation, washing, solid-liquid separation, drying and recovery systems
Define the engagement
A process-engineering enquiry becomes actionable when the material, product target and site constraints are defined. Use the following basis to scope an initial review, rather than assuming every project needs a complete EPC package.
| Workstream | Inputs to establish | Proposed output to agree |
|---|---|---|
| Design basis | Feed composition and variability, target product, capacity, operating mode and site constraints | Requirements register, assumptions and open technical questions |
| Process definition | Available flowsheets, representative data, utilities and material balances | BFD/PFD, balance basis and unit-operation duties within the agreed scope |
| Pilot and scale-up | Unresolved process questions, sample availability and analytical methods | Test plan, evidence gaps and scale-up decision criteria |
| Equipment and integration | Package duties, battery limits, controls, layout and utility interfaces | Equipment specifications, interface register and acceptance-test basis |
These are scoping guides, not an included-scope checklist or a performance guarantee. Deliverables, responsibilities, exclusions, testing and acceptance criteria must be agreed for the specific engagement.
Connect the design basis to an integrated production line ↗
Identify the uncertainty explicitly. An initial review can frame the missing data and test questions; it does not turn assumptions into an approved design basis.
No. Engineering support, equipment supply, site work, third-party assessment and statutory responsibilities require explicit scope and responsibility allocation. Public service descriptions are not contractual acceptance.